Yamaha marine rigging & parts command link 2nd station main harness

Wiring harnesses and accessories. Electrical components

    The DEC second station main harness connects the main station control box with the second station control with the help of a secondary harness. The second station main harness as one 6 pin, one 4 pin, and one 3 pin connections on each end. One second station primary harness is required per engine when rigging a second station. For use with current Command Link® controls ONLY because of a different style 3 pin connector. Because of the different 3 pin connector, an adaptor harness will be required when a CLP main station is connected to a current Command Link® second station.

детальцена
Command Link 2nd Station Main Harness - 16 ft.
29 151.00р
под заказ
Command Link 2nd Station Main Harness - 26 ft.
45 763.00р
под заказ
Command Link 2nd Station Main Harness - 40 ft.
56 944.00р
под заказ